KENYA RURAL ROADS AUTHORITY
TENDER NOTICE ADDENDUM No. 5
UPGRADING, SPOT IMPROVEMENT & CONSTRUCTION OF DRAINAGE STRUCTURES ON VARIOUS ROADS – BATCH 3
Reference is made to the Tender Notice that appeared in the MyGov Edition of Star Newspaper dated 3rd March 2026, the Long Advert dated 17th April 2026, Addendum No. 1 dated 28th April 2026, Addendum No. 2 dated 8th May 2026, Addendum No. 3 dated 14th May 2026, and Addendum No. 4 dated 17th May, 2026.
Interested Bidders are requested to note the following clarifications and amendments;
| ITEM | DESCRIPTION | UNIT | QTY | RATE | AMOUNT |
| 1.05 | Allow a prime cost sum of 500,000 for laboratory material tests | PC Sum | 1 | 500,000.00 | |
| 1.05b | Extra over 1.05 for contractor’s overhead and profit | % | item | ||
| 1.15 | Allow a prime cost sum for the Res Miscellaneous Account and supervision cost | PC Sum | 1 | 2,000,000.00 | |
| 1.16 | Extra over 1.15 for contractor’s overhead and profit | % | Item | ||
| 1.19 | Provide, erect and maintain publicity signs as directed by the Engineer. | No | 2 | ||
| Bill No. 1 Total Carried Forward to Grand Summary | |||||
| Bill Item | Description | Unit | Quantity | Rate | Amount |
| 10.02 | Heavy grading with watering and compaction | M2 | 320,000 |
| Bill 10. GRADING AND GRAVELLING WORKS | |||||
| Item No | Description | Unit | Qty | Unit rate | Amount |
| Note: No overhaul will be paid for separately under these items as it shall be deemed to have been included in the Contractor’s rates | |||||
| 10.01 | Heavy grading with watering and compaction and as instructed by the Engineer | M² | 160,000.00 | ||
| 10.02 | Provide gravel wearing course – excavation, free haul, spread, water and compact gravel to specifications | M³ | 9,990.00 | ||
| Total of Bill No 10 Carried Forward to summary Page | |||||
The Director General,
Kenya Rural Roads Authority,
Barabara Plaza Block B, Mazao Road, Opposite KCAA building,
Email Adresses : procurementhq@kerra.go.ke, dg@kerra.go.ke
Tel: +254 (020) 780600/01-05, Mobile: 0711851103
Deputy Director (Supply Chain Management) FOR: DIRECTOR GENERAL