UPGRADING, SPOT IMPROVEMENT & CONSTRUCTION OF DRAINAGE STRUCTURES ON VARIOUS ROADS – LOT 5-ADDENDUM NO. 1

January 19, 2026 - In Tender Notice

KENYA RURAL ROADS AUTHORITY

 

ADDENDUM NO. 1

UPGRADING, SPOT IMPROVEMENT & CONSTRUCTION OF DRAINAGE STRUCTURES ON VARIOUS ROADS – LOT 5

Addendum No.1 – Lot 5 (Sp exp) revised

Reference is made to the Tender Notice that appeared in the MyGov Edition of the Star Newspaper dated 16th December, 2025 and the Long Advert dated 22nd December, 2025.

The Authority has received requests for clarification on the above referenced procurement and Interested Applicants are requested to note the following clarifications;

  1. The Tender Document for the Tender for Upgrading to Bitumen Standard of Busweta – Ikobero – Chavogere – Cheptech – Shinyalu Road, Tender No. RWC858 has been revised and shall be available as from 23rd January, 2026.
  2. The following items have been amended under Table 1 for Technical & Financial Capacity Evaluation for ALL the Tenders in Lot 5.
  3. Annual Average Construction Turnover contained under Item No. 2.2
  4. Specific Construction Experience contained under Item No. 3.2(a).
SN Road Name Clarification and Amendment
Annual Construction Turnover Specific Construction Experience
1. RWC 841: Upgrading to Bitumen Standard of Dadaab Town roads Minimum average annual construction turnover KShs. 500,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years. Participation as the main contractor, in at least One (1) contract with a value of at least Kshs. 500,000,000.00 within the last Ten (10) Years…”
2. RWC 842: Upgrading to Bitumen Standard of Baolala – Matano Mane – Dida – Kakajuni Road Minimum average annual construction turnover KShs. 750,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years Participation as the main contractor, in at least One (1) contract with a value of at least Kshs. 1,000,000,000.00 within the last Ten (10) Years…”
3. RWC 843: Upgrading to Bitumen Standard of Kipsitet Market – Kipsitet Primary School – Muhoroni Junction/Kipsitet Pry – Koitaburot – Kapchebwai – Kisumu Ndogo Road Project Minimum average annual construction turnover KShs. 500,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years Participation as the main contractor, in at least One (1) contract with a value of at least Kshs. 800,000,000.00 within the last Ten (10) Years…”
4. RWC 844: Upgrading to Bitumen Standard of Sameta – Egetuki – Ikoba Roads Minimum average annual construction turnover KShs. 400,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years Participation as the main contractor, in at least One (1) contract with a value of at least Kshs. 300,000,000 within the last Ten (10) Years…”
5. RWC 845: Upgrading to Bitumen Standard of Nyabigena/ Matangamano – Esaka – Nyamarambe/ Mochengo – Ayora – Moticho – Nyansembe/ Moticho – Maroo – Otendo Elck Pry Roads Minimum average annual construction turnover KShs. 400,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years Participation as the main contractor, in at least One (1) contract with a value of at least Kshs. 700,000,000 within the last Ten (10) Years…”
6. RWC 846: Construction of Omingo/Magara Bridge and Gravel Approach Roads Minimum average annual construction turnover KShs. 80,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years Participation as the main contractor, in at least One (1) contract with a value of at least KShs. 80,000,000.00 within the last Ten (10) Years…”
7. RWC 848: Upgrading to Bitumen Standard of Imenti – Wamura – Kona Mbaya Road Minimum average annual construction turnover KShs. 300,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years Participation as the main contractor, in at least One (1) contract with a value of at least Kshs. 700,000,000.00 within the last Ten (10) Years…”
8. RWC 849: Upgrading to Bitumen Standard of Loldaiga Gate – Mugumo – Ndemu – Umande – Ngenia – Kongoni Road Minimum average annual construction turnover KShs. 400,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years Participation as the main contractor, in at least One (1) contract with a value of at least Kshs. 700,000,000.00 within the last Ten (10) Years…”
9. RWC 850: Upgrading to Bitumen Standard of Mirera Jnc – Sweetwaters – Olpajeta Gate Road Minimum average annual construction turnover KShs. 400,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years Participation as the main contractor, in at least One (1) contract with a value of at least Kshs. 500,000,000.00 within the last Ten (10) Years..”
10. RWC 851: Rehabilitation of Narumoru – Ngare Ng’iro – Withare – Makutano Road Minimum average annual construction turnover KShs. 500,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years. Participation as the main contractor, in at least Two (2) contracts each with a value of at least Kshs. 1,000,000,000.00 within the last Ten (10) Years..
11. RWC 852: Upgrading to Bitumen Standard of A7(Showground, Hindi) – Lamu Red Cross Centre – Safirisi – A7(Ndeu) And Access Roads Minimum average annual construction turnover KShs. 400,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years. Participation as the main contractor, in at least One (1) contract with a value of at least Kshs. 500,000,000.00 within the last Ten (10) Years…”
12. RWC 853: Upgrading to Bitumen Standard of Miseleni – Kwa Mwaura Minimum average annual construction turnover KShs. 300,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years. Participation as the main contractor, in at least One (1) contract with a value of at least Kshs. 480,000,000 within the last Ten (10) Years…”
13. RWC 854: Upgrading to Bitumen Standard of  Mapera – Rabuor, Osingo – Nyaduong Phase II And Godjope – Wasio Roads Minimum average annual construction turnover KShs. 500,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years. Participation as the main contractor, in at least Two (2) contracts with a cumulative value of at least Kshs. 750,000,000.00 within the last Ten (10) Years…”
14. RWC 855: Upgrading To Bitumen Standard of Gilgil – Gitare – Kanyiriri  Road Minimum average annual construction turnover KShs. 500,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years. Participation as the main contractor, in at least One (1) contract with a value of at least Kshs. 700,000,000.00 within the last Ten (10) Years…”
15. RWC 856: Upgrading to Bitumen  Standard of Kongasis – Elmentaita – Kikopey Road & Tangi Tano – Forest View Police Post Road Minimum average annual construction turnover KShs. 750,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years. Participation as the main contractor, in at least One (1) contract with a value of at least Kshs. 1,000,000,000.00 within the last Ten (10) Years
16. RWC 857: Upgrading to Bitumen Standard of Labuiywo – Kapkoros – Kitechgaa/Kapkoros –

Kapsokio – Koisagat Road

Minimum average annual construction turnover KShs. 500,000,000.00 calculated as an annual average of the total payments received from construction works within the last Five (5) years. Participation as the main contractor, in at least One (1) contract each with a value of at least Kshs. 800,000,000.00 within the last Ten (10) Years..

 

  1. Bill No. 4 for the tender for Upgrading to Bitumen Standard of A7 (Showground, Hindi) – Lamu Red Cross Centre – Safirisi – A7(Ndeu) And Access Roads, Tender No. RWC 852 has been revised and is attached as Annex 1
  2. Item No. xiv on Maintenance of works for 36 months” captured under the tender for Upgrading to Bitumen Standard of Baolala – Matano Mane – Dida – Kakajuni Road, Tender No. RWC 842 SHALL not be applicable.
  3. Pre-Tender Site Visits shall be Mandatory but OPEN to interested bidders for ALL the Tenders under Lot 5. The site visits shall be held on agreed dates and times with the respective Regional Directors for interested bidders who will want to visit site. Bidders shall be required to have the Certificate of Bidder`s visit to site signed by the respective Regional Directors.
  4. The Contact Details for the Regional Directors are available in the Long Advertisement dated 22nd December 2025.
  5. That the submission date for the tenders has been revised as follows: from 23rd January, 2026 to
    6th February, 2026 at 11.00am.
  6. The Employer SHALL verify the authenticity of all guarantees with the Central Bank of Kenya for they are the regulator of all banking practices.
  7. Interested Applicants are required to continually check the Authority’s website: kerra.go.ke for any tender addendums or clarifications that may arise before submission date.
  1. Bidders with enquiries are encouraged to do so vide the email address procurementhq@kerra.go.ke.
  2. All other information remains the same.

 

DIRECTOR GENERAL

KENYA RURAL ROADS AUTHORITY

 

 

 

Reach Us

Barabara Plaza Block B,

Airport South Road,

P.O Box 48151 – 00100
Nairobi, KENYA

Mon – Fri: 8:00 am – 5:00 pm

Our Newsletters

Subscribe to Receive our latest Newsletters

Connect With Us

Copyright © 2024 Kenya Rural Roads Authority . All Rights Reserved. || Developed by Xtranet Communication.