Tel: +254 711 851103
 
 
Language:

Google Translate Widget by Infofru

Author Site Reviewresults

Thursday, 05 September 2024

 

MONTH: JANUARY

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

 

 

 

 

 

MONTH: FEBRUARY

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

 

 ADDEDUM 1

 

TENDER NUMBER

PROJECT NAME (Road No. and Name) & (Eligible Group)

 

Scope of Works

MANDATORY PRE-TENDER SITE VISIT: Date, venue and Time

TENDER CLOSING/SUBMISSION DATES AND TIME

 

Download

KeRRA/011/TTVT/39/001/2018-2019

D 1094:   A23 Rekeke – Lake Jipe Road (Pre-qualified Firms – Taveta – Category C)

- Light Bush Clearing

- Light Grading

- Gravel Patching

- Soil erosion mitigation measures

29th January, 2019 KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/002/2018-2019

E 3059:   D537 Taveta – Madarasani Road (AGPO - Youth)

- Light Bush Clearing

- Light Grading

- Gravel Patching

- Soil erosion mitigation measures

29th January, 2019 KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/003/2018-2019

E 3060:   Eldoro – Kitobo Road (Pre-qualified Firms – Taveta – Category C)

- Light Bush Clearing

- Ditch Cleaning

- Culvert Installation 900mm

- Light Grading

- Gravel Patching

- Soil erosion mitigation measures

29th January, 2019 KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/004/2018-2019

E 3061:   Taveta – Eldoro Road (AGPO – Women)

- Light Bush Clearing

- Ditch Cleaning

- Culvert Installation 900mm

- Light Grading

- Gravel Patching

- Soil erosion mitigation measures

29th January, 2019 KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/005/2018-2019

E 3062:   Taveta – Ngutini Road (AGPO – PWD)

 - Light Bush Clearing

- Ditch Cleaning

- Light Grading

- Gravel Patching

- Soil erosion mitigation measures

29th January, 2019 KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/006/2018-2019

E 3063:   Mboghoni – Timbila Road (Pre-qualified Firms – Taveta – Category C)

- Light Bush Clearing

- Ditch Cleaning

- Light Grading

- Gravel Patching

29th January, 2019 KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/0072018-2019

C272:   Mghaghamu – Sirienyi Road (Pre-qualified Firms – Wundanyi – Category C)

- Light Bush Clearing

- Ditch Cleaning

- Culvert Cleaning- partially blocked- 900mm

- Light Grading

- Gravel Patching

- Soil erosion mitigation measures

30th January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/008/2018-2019

C273:   Kisimani – Kayanda Sec. School Road (AGPO – Women)

- Light Grading

- Gravel Patching

- Soil erosion mitigation measures

29th January, 2019 KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/009/2018-2019

D1100:   Kungu – Wundanyi Road (AGPO – PWD)

- Light Bush Clearing

- Light Grading

- Gravel Patching

- Soil erosion mitigation measures

30th January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/010/2018-2019

E3080:   Mkamwasi – Ngerenyi Road (Pre-qualified Firms – Wundanyi – Category C)

- Light Bush Clearing

- Laying of side slabs

- Heavy Grading

- Soil erosion mitigation measures

30th January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/011/2018-2019

E3082:   Kishushe – Makandenyi Road (AGPO – Youth)

- Laying of side slabs

- Culvert Installation 900mm

- Heavy Grading

- Soil erosion mitigation measures

30th January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/012/2018-2019

E3082:   Makandenyi –Ghazi Road (Pre-qualified Firms – Wundanyi – Category C)

- Light Bush Clearing

- Laying of side slabs

- Culvert Installation 900mm

- Heavy Grading

- Soil erosion mitigation measures

30th January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/013/2018-2019

F3018:   Canon Kituri – Kungu Road (Pre-qualified Firms – Wundanyi – Category C)

- Light Bush Clearing

- Light Grading

- Gravel Patching

- Soil erosion mitigation measures

30th January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/014/2018-2019

C272:   Bura Station – Mghaghamu Road (Pre-qualified Firms – Mwatate – Category C)

- Light Bush Clearing

- Ditch Cleaning

- Laying of side slabs

- Culvert Cleaning- partially blocked- 900mm

- Light Grading

- Soil erosion mitigation measures

30th January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/015/2018-2019

C272:   Sirienyi –Shelemba Road (AGPO – Youth)

- Light Bush Clearing

- Culvert Installation 900mm

- Light Grading

- Soil erosion mitigation measures

30th January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/016/2018-2019

C273:   Maktau – Kisimani Road (Pre-qualified Firms – Mwatate – Category C)

- Light Bush Clearing

- Light Grading

- Gravel Patching

29th January, 2019 KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/017/2018-2019

C274:   Figinyi - Mwambirwa Road Pre-qualified Firms – Mwatate – Category C)

- Light Bush Clearing

- Laying of side slabs

- Light Grading

- Soil erosion mitigation measures

31st January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/018/2018-2019

D1098:   Msau – Kighombo Road (Pre-qualified Firms – Mwatate – Category C)

- Light Bush Clearing

- Laying of side slabs

- Culvert Installation 900mm

- Light Grading

- Soil erosion mitigation measures

31st January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/019/2018-2019

D1100:  A23 Mwatate  – Wusi Junc Road    (AGPO – PWD)

- Light Bush Clearing

- Laying of side slabs

- Heavy Grading

- Soil erosion mitigation measures

30th January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/020/2018-2019

D1100:   Dembwa – Kungu Road (Pre-qualified Firms – Mwatate – Category C)

- Light Bush Clearing

- Light Grading

- Gravel Patching

- Soil erosion mitigation measures

30th January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/021/2018-2019

D1101:   C104 Mwatate – Mwatunge Road (Pre-qualified Firms – Mwatate – Category C)

- Light Bush Clearing

- Light Grading

- Gravel Patching

- Soil erosion mitigation measures

30th January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/022/2018-2019

E3080:   Maktau – Mkamwasi Road (AGPO – Women)

- Light Bush Clearing

- Light Grading

- Gravel Patching

30th January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/023/2018-2019

F3019:   Bura Mission – Mghange Dawida Road (Pre-qualified Firms – Mwatate – Category C)

- Light Bush Clearing

- Light Grading

- Gravel Patching

- Soil erosion mitigation measures

30th January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/024/2018-2019

C206:   Rukanga – Mackinon Road (Pre-qualified Firms – Voi – Category C)

- Light Grading

31st January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/025/2018-2019

C273:  Kayanda Sec. School – Ndii Road (AGPO – Women)

- Light Bush Clearing

- Light Grading

- Soil erosion mitigation measures

29th January, 2019 KeRRA Taveta Constituency Offices, in Taveta Town, at 10:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/026/2018-2019

C274:   Mwambirwa –Ndii Road (Pre-qualified Firms – Voi – Category C)

- Light Bush Clearing

- Laying of side slabs

- Light Grading

- Soil erosion mitigation measures

31st January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/027/2018-2019

C275:  Rukanga – Maungu Road (AGPO – Youth)

- Light Bush Clearing

- Light Grading

- Soil erosion mitigation measures

31st January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/028/2018-2019

D1098:  Kighombo – Konenyi Road (Pre-qualified Firms – Voi – Category C)

- Light Bush Clearing

- Light Grading

- Gravel Patching

- Soil erosion mitigation measures

31st January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/029/2018-2019

E3074:   Voi – Mwalangi Road (AGPO – PWD)

- Light Bush Clearing

- Laying of side slabs

- Heavy Grading

- Soil erosion mitigation measures

31st January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/030/2018-2019

E3075:  Kanyanga – Mwalangi Road (Pre-qualified Firms – Voi – Category C)

- Heavy Grading

31st January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/031/2018-2019

E3076:  Kajire – Gimba Road (AGPO – Youth)

- Light Grading

31st January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/032/2018-2019

E3076:  Ndara – Kajire Road (Pre-qualified Firms – Voi – Category C)

- Light Bush Clearing

- Light Grading

31st January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/033/2018-2019

E3083:  Wongonyi – Konenyi Road (Pre-qualified Firms – Voi – Category C)

- Light Bush Clearing

- Laying of side slabs

- Heavy Grading

- Soil erosion mitigation measures

31st January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/034/2018-2019

E3017:   Kitege – Bungule Road (AGPO – Women)

- Light Grading

31st January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

KeRRA/011/TTVT/39/035/2018-2019

G3822:   Tausa – Irima Road (Pre-qualified Firms – Voi – Category C)

- Light Bush Clearing

- Light Grading

31st January, 2019 KeRRA Voi Regional  Offices, in Voi Town, at 9:00 am.

6th February, 2019 at 10:00 am

Download

 

 

MONTH: MARCH

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

 

 

 

MONTH:APRIL

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

 

 

 

 

MONTH:MAY

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

 

 

 

MONTH: JUNE

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

 

 

 

MONTH: JULY

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

 

 

 

MONTH: AUGUST

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

 

 

Contact Us

Our Head Office

Kenya Rural Roads Authority,
Barabara Plaza, Block B
Airport South Road, Opp. KCAA
P.o. Box 48151-00100,
Nairobi. Kenya

Email: dg@kerra.go.ke 
Tel: 020-7807600 (01-05)
Mobile: +254 711 851103

**All email Communication to be channelled through the email dg@kerra.go.ke ** 

 

Copyright © 2024 Kenya Rural Roads Authority (KeRRA is ISO 9001:2008 Certified). All Rights Reserved.
Joomla! is Free Software released under the GNU General Public License.